Special Risk – Welland Energy Site

Welland Energy Site

Project Value: £60k

Part of a new build energy plant facility, Ultra Surefire designed and installed a deluge application cooling system to protect the external LPG storage tank. The system was supplied with dry pilot line actuation using closed bulb sprinkler heads linked to the deluge valve and open spray nozzles.

The system was fed via the existing water storage fire system installed by Ultra Surefire under a separate contract, a new dedicate 100mm main was run to feed the deluge valve housed local to the risk and connected to the in house alarm system.

Contact Us

We are ready to answer your questions

Ultra Surefire are ready to answer your questions on fire protection, suppression and detection.

Experienced technical engineers and fire system designers are available via email or you can call and speak to us. Let us know your requirements and we will arrange a detailed survey or discussion.

Download Brochure

Download Ultra Surefire Brochure

Download Ultra Surefire Brochure here

An overview of the latest news from Ultra Surefire

Understood
This website is using cookies. More details