Project Value: £350k
A waste recycling facility in Arundel. Ultra Surefire were commissioned to design and conduct a fire test for the conveyor systems. The test was set up on site in a remote container and filled with the various waste products from plastic to paper over a series of live fire tests. The tests were witnessed by the client, insurer and verified by The FPA.
Ultra Surefire were awarded the contract to design and install the suppression and linear heat detection system in line with the fire test protocol to all enclosed conveyors.
Upon completion, Ultra Surefire were subsequently awarded the service and maintenance contract.