Project Value: £220k
Part of a new build project by Vinci Group, Ultra Surefire designed and installed a Low Pressure watermist system using our Ultramist technology complete with dedicated water storage tank and package pump unit. The installation covered all areas of the Hotel, back of house, front of house and bedroom accommodation.
The system was designed using Ultramist concealed range of nozzles and installed to BS 8489 requirements.